4 November 2005 A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs
Author Affiliations +
Proceedings Volume 5997, Environmentally Conscious Manufacturing V; 59970A (2005) https://doi.org/10.1117/12.637368
Event: Optics East 2005, 2005, Boston, MA, United States
Abstract
This paper deals with disassembly sequencing problems subjected to sequence dependent disassembly costs. We present a heuristic and an iterative method based on partial branch and bound concept to solve such problems. Since heuristic methods intrinsically generate suboptimum solutions, we compared the heuristically obtained solutions with the exact solutions to see if they are reasonably good or not. This process, however, is limited to small or perhaps medium sized problems only as the required CPU time for exact methods tends to increase exponentially with the problem size. For the problems tested, we observed that the methods described in this paper generate surprisingly good results using almost negligible amount of CPU time.
© (2005) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
A. J. D. Lambert and Surendra M. Gupta "A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs", Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970A (4 November 2005); https://doi.org/10.1117/12.637368
Lens.org Logo
CITATIONS
Cited by 7 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Cell phones

Computer programming

Iterative methods

Antennas

Manufacturing

Binary data

Explosives

RELATED CONTENT

Reflect-array based mm-wave people screening system
Proceedings of SPIE (October 18 2013)
Optimum disassembly sequencing
Proceedings of SPIE (October 09 2006)
Disassembly sequencing problem a case study of a cell...
Proceedings of SPIE (December 08 2004)
Expert system for heatpipe bakeout
Proceedings of SPIE (January 01 1990)

Back to Top