PROCEEDINGS VOLUME 5997
OPTICS EAST 2005 | 23-26 OCTOBER 2005
Environmentally Conscious Manufacturing V
OPTICS EAST 2005
23-26 October 2005
Boston, MA, United States
Disassembly
Proc. SPIE 5997, A multi-start greedy heuristic for the disassembly sequence problem, 599701 (4 November 2005); doi: 10.1117/12.630034
Proc. SPIE 5997, Multi-criteria decision making approach in multiple periods for a disassembly-to-order system under product’s deterioration and stochastic yields, 599702 (8 November 2005); doi: 10.1117/12.630752
Proc. SPIE 5997, Environmental practices of the auxiliary companies to the Spanish automobile industry, 599703 (8 November 2005); doi: 10.1117/12.659366
Proc. SPIE 5997, Multi-kanban mechanism for appliance disassembly, 599704 (8 November 2005); doi: 10.1117/12.631026
Reverse Logistics and Supply Chain
Proc. SPIE 5997, Mechanism for coordination between the collector and the dismantler in a reverse supply chain, 599706 (8 November 2005); doi: 10.1117/12.629299
Proc. SPIE 5997, A heuristic approach using multiple criteria for environmentally benign 3PLs selection, 599707 (8 November 2005); doi: 10.1117/12.630406
Proc. SPIE 5997, A fuzzy-AHP based approach for selecting potential recovery facilities in a closed-loop supply chain, 599708 (4 November 2005); doi: 10.1117/12.631251
Proc. SPIE 5997, An integrated conceptual framework for selecting reverse logistics providers in the presence of vagueness, 599709 (8 November 2005); doi: 10.1117/12.632082
Disassembly Line
Proc. SPIE 5997, A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs, 59970A (4 November 2005); doi: 10.1117/12.637368
Proc. SPIE 5997, Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem, 59970B (4 November 2005); doi: 10.1117/12.629121
Proc. SPIE 5997, The effect of sudden server breakdown on the performance of a disassembly line, 59970C (4 November 2005); doi: 10.1117/12.630866
Proc. SPIE 5997, Impact of different disassembly line balancing algorithms on the performance of dynamic kanban system for disassembly line, 59970D (8 November 2005); doi: 10.1117/12.631371
Organic Waste and the Environment
Proc. SPIE 5997, Developing a framework for applying disassembly planning and demanufacturing modeling to organic processing waste streams, 59970E (8 November 2005); doi: 10.1117/12.629971
Proc. SPIE 5997, Modeling the economics of landfilling organic processing waste streams, 59970F (8 November 2005); doi: 10.1117/12.630580
Product Recovery and Remanufacturing
Proc. SPIE 5997, Practical LCA for short shelf life products, 59970G (8 November 2005); doi: 10.1117/12.628155
Proc. SPIE 5997, Optimal production policy for a remanufacturing system with virtual inventory cost, 59970H (8 November 2005); doi: 10.1117/12.630803
Proc. SPIE 5997, Pricing end-of-life components, 59970I (8 November 2005); doi: 10.1117/12.631021
Proc. SPIE 5997, Multi-criteria analysis of potential recovery facilities in a reverse supply chain, 59970J (8 November 2005); doi: 10.1117/12.631250
Proc. SPIE 5997, Understanding facilities design parameters for a remanufacturing system, 59970K (8 November 2005); doi: 10.1117/12.631338
Environmental Issues
Proc. SPIE 5997, Eco-efficiency of solid waste management in Welsh SMEs, 59970L (8 November 2005); doi: 10.1117/12.631778
Proc. SPIE 5997, A quadranomial real options model for evaluation of emissions trading and technology, 59970M (8 November 2005); doi: 10.1117/12.631775
Proc. SPIE 5997, A simulation study for the application of two different neural network control algorithms on an electrohydraulic system, 59970O (8 November 2005); doi: 10.1117/12.630416
Proc. SPIE 5997, Quality of returns: Is it a factor in remanufacturing?, 59970P (8 November 2005); doi: 10.1117/12.640449
Proc. SPIE 5997, On the effect of part quality in hybrid production systems, 59970Q (8 November 2005); doi: 10.1117/12.640450
Back to Top