PROCEEDINGS VOLUME 9150
SPIE ASTRONOMICAL TELESCOPES + INSTRUMENTATION | 22-27 JUNE 2014
Modeling, Systems Engineering, and Project Management for Astronomy VI
Proceedings Volume 9150 is from: Logo
SPIE ASTRONOMICAL TELESCOPES + INSTRUMENTATION
22-27 June 2014
Montréal, Quebec, Canada
Front Matter: Volume 9150
Proc. SPIE 9150, Front Matter: Volume 9150, 915001 (20 August 2014); doi: 10.1117/12.2075747
Project Management I
Proc. SPIE 9150, Success in large high-technology projects: What really works?, 915002 (4 August 2014); doi: 10.1117/12.2057972
Proc. SPIE 9150, Generic documentation tree for science ground segments, 915004 (4 August 2014); doi: 10.1117/12.2055847
Proc. SPIE 9150, Tackling five main problem areas found in science (ground segment) project developments, 915005 (4 August 2014); doi: 10.1117/12.2056294
Project Management II
Proc. SPIE 9150, The tail wags the dog: managing large telescope construction projects with lagging requirements and creeping scope, 915006 (5 August 2014); doi: 10.1117/12.2052724
Proc. SPIE 9150, Daniel K. Inouye Solar Telescope system safety, 915007 (4 August 2014); doi: 10.1117/12.2056752
Proc. SPIE 9150, Integrated Logistics Support approach: concept for the new big projects: E-ELT, SKA, CTA, 915008 (4 August 2014); doi: 10.1117/12.2057606
Proc. SPIE 9150, De-mystifying earned value management for ground based astronomy projects, large and small, 915009 (4 August 2014); doi: 10.1117/12.2056543
System Integration, Verification, and Validation
Proc. SPIE 9150, The commissioning of Gaia, 91500A (4 August 2014); doi: 10.1117/12.2056095
Proc. SPIE 9150, The ALMA assembly, integration, and verification project: a retrospective analysis, 91500B (4 August 2014); doi: 10.1117/12.2056310
Proc. SPIE 9150, Daniel K. Inouye Solar Telescope: integration testing and commissioning planning, 91500C (4 August 2014); doi: 10.1117/12.2056793
Proc. SPIE 9150, Planning and reality of the final verification and on-site assembly of KMOS for the VLT, 91500E (4 August 2014); doi: 10.1117/12.2058523
System Designs and Architectures
Proc. SPIE 9150, Feed array metrology and correction layer for large antenna systems in ASIC mixed signal technology, 91500F (4 August 2014); doi: 10.1117/12.2051302
Proc. SPIE 9150, Overview of the LSST active optics system, 91500G (4 August 2014); doi: 10.1117/12.2056553
Proc. SPIE 9150, Real time wavefront control system for the Large Synoptic Survey Telescope (LSST), 91500H (4 August 2014); doi: 10.1117/12.2055390
Proc. SPIE 9150, NEAT breadboard system analysis and performance models, 91500I (4 August 2014); doi: 10.1117/12.2055098
Proc. SPIE 9150, Relative performance of dispersive and non-dispersive far-infrared spectrometer instrument architectures, 91500J (5 August 2014); doi: 10.1117/12.2056524
Proc. SPIE 9150, Running AIM: initial data treatment and micro-arcsec level calibration procedures for Gaia within the astrometric verification unit, 91500K (5 August 2014); doi: 10.1117/12.2057082
Model Based Systems Engineering
Proc. SPIE 9150, Model based systems engineering for astronomical projects, 91500L (4 August 2014); doi: 10.1117/12.2055540
Proc. SPIE 9150, Systems engineering in the Large Synoptic Survey Telescope project: an application of model based systems engineering, 91500M (4 August 2014); doi: 10.1117/12.2056781
Proc. SPIE 9150, Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST), 91500N (4 August 2014); doi: 10.1117/12.2056773
System Modeling I
Proc. SPIE 9150, Transient aero-thermal simulations for TMT, 91500P (4 August 2014); doi: 10.1117/12.2056569
Proc. SPIE 9150, Unsteady wind loads for TMT: replacing parametric models with CFD, 91500Q (4 August 2014); doi: 10.1117/12.2057295
Proc. SPIE 9150, Estimating dome seeing for LSST, 91500R (4 August 2014); doi: 10.1117/12.2054436
Proc. SPIE 9150, Wavefront sensing and control performance modeling of the Thirty Meter telescope for systematic trade analyses, 91500S (4 August 2014); doi: 10.1117/12.2057157
Proc. SPIE 9150, TOAD: a numerical model for the 4MOST instrument, 91500T (4 August 2014); doi: 10.1117/12.2056463
Systems Engineering I
Proc. SPIE 9150, Systems engineering plan for the construction phase of the E-ELT, 91500U (4 August 2014); doi: 10.1117/12.2055188
Proc. SPIE 9150, Systems engineering of the Thirty Meter Telescope for the construction phase, 91500V (4 August 2014); doi: 10.1117/12.2056870
Proc. SPIE 9150, The Paving Stones: initial feed-back on an attempt to apply the AGILE principles for the development of a CubeSat space mission to Mars, 91500W (4 August 2014); doi: 10.1117/12.2056377
Proc. SPIE 9150, Automatic performance budget: towards a risk reduction, 91500X (4 August 2014); doi: 10.1117/12.2054474
Proc. SPIE 9150, Project management for complex ground-based instruments: MEGARA plan, 91500Y (4 August 2014); doi: 10.1117/12.2055935
Systems Engineering II
Proc. SPIE 9150, System modeling of the Thirty Meter Telescope alignment and phasing system, 91500Z (4 August 2014); doi: 10.1117/12.2057066
Proc. SPIE 9150, Systems and context modeling approach to requirements analysis, 915010 (4 August 2014); doi: 10.1117/12.2057396
Proc. SPIE 9150, TMT telescope structure thermal model, 915011 (4 August 2014); doi: 10.1117/12.2056582
Proc. SPIE 9150, Heat balance and thermal management of the TMT Observatory, 915012 (4 August 2014); doi: 10.1117/12.2057152
Proc. SPIE 9150, Polarimetric analysis of the Thirty Meter Telescope (TMT) for modeling instrumental polarization characteristics, 915013 (4 August 2014); doi: 10.1117/12.2056965
System Modeling II
Proc. SPIE 9150, An end-to-end simulation framework for the Large Synoptic Survey Telescope, 915014 (4 August 2014); doi: 10.1117/12.2054953
Proc. SPIE 9150, The LSST operations simulator, 915015 (4 August 2014); doi: 10.1117/12.2056898
Proc. SPIE 9150, DPAC operations simulation to take up the Gaia challenge, 915016 (4 August 2014); doi: 10.1117/12.2056008
Proc. SPIE 9150, A framework for modeling the detailed optical response of thick, multiple segment, large format sensors for precision astronomy applications, 915017 (4 August 2014); doi: 10.1117/12.2057411
Proc. SPIE 9150, Have confidence in your coronagraph: statistical analysis of high-contrast coronagraph dynamics error budgets, 915018 (4 August 2014); doi: 10.1117/12.2054960
Systems Engineering III
Proc. SPIE 9150, Daniel K. Inouye Solar Telescope systems engineering update, 915019 (4 August 2014); doi: 10.1117/12.2056710
Proc. SPIE 9150, Managing the system validation of the DKIST enclosure, 91501A (4 August 2014); doi: 10.1117/12.2056369
Proc. SPIE 9150, Systems engineering implementation in the conceptual design phase of 4MOST, 91501B (5 August 2014); doi: 10.1117/12.2056301
Proc. SPIE 9150, From space to specs: requirements for 4MOST, 91501C (4 August 2014); doi: 10.1117/12.2056466
Proc. SPIE 9150, Complexity in the MATISSE cold optics: a risk or a tool?, 91501D (4 August 2014); doi: 10.1117/12.2056929
Poster Session
Proc. SPIE 9150, Novel technique for tracking manpower and work packages: a useful tool for the team and management, 91501E (4 August 2014); doi: 10.1117/12.2054745
Proc. SPIE 9150, Space radiation parameters for EUI and the Sun Sensor of Solar Orbiter, ESIO, and JUDE instruments, 91501H (4 August 2014); doi: 10.1117/12.2052703
Proc. SPIE 9150, GAME/ISAS development status, 91501I (5 August 2014); doi: 10.1117/12.2054869
Proc. SPIE 9150, Thermal design and performance of the REgolith x-ray imaging spectrometer (REXIS) instrument, 91501J (5 August 2014); doi: 10.1117/12.2054995
Proc. SPIE 9150, Design of one large telescope direct drive control system based on TMS320F28xx, 91501L (5 August 2014); doi: 10.1117/12.2055134
Proc. SPIE 9150, BIRDY: an interplanetary CubeSat to collect radiation data on the way to Mars and back to prepare the future manned missions, 91501N (4 August 2014); doi: 10.1117/12.2056114
Proc. SPIE 9150, Chilean virtual observatory and integration with ALMA, 91501O (4 August 2014); doi: 10.1117/12.2056766
Proc. SPIE 9150, Plate coil thermal test bench for the Daniel K. Inouye Solar Telescope (DKIST) carousel cooling system, 91501Q (4 August 2014); doi: 10.1117/12.2057029
Proc. SPIE 9150, FRIDA diffraction limited NIR instrument: the challenges of its verification processes, 91501R (4 August 2014); doi: 10.1117/12.2057439