20 March 1985 Location Of Reinforcement By Induction-Thermography
Author Affiliations +
Abstract
Despite careful detailed planning of reinforced concrete structures, technical installations must subsequently be anchored in the concrete. The longer the time between the planning and completion of the structure, the greater is the expense and the more dependent the structure is on the further technical development of the installation. In power station construction, for example, one expects to have to install several hundred thousand anchorages for each station. The reinforcing rods should not be damaged during the necessary drilling work. Each damaged rod must be checked to ensure that the safe loadbearing properties of the structure are not impaired. A method which shows the exact position of the reinforcement in the concrete, considerably reduces the incidental and consequential costs of drilling work (Figure 1).
© (1985) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Ing. Bernd Hillemeier, Ing. Bernd Hillemeier, } "Location Of Reinforcement By Induction-Thermography", Proc. SPIE 0520, Thermosense VII: Thermal Infrared Sensing for Diagnostics and Control, (20 March 1985); doi: 10.1117/12.946154; https://doi.org/10.1117/12.946154
PROCEEDINGS
10 PAGES


SHARE
Back to Top