PROCEEDINGS VOLUME 10705
SPIE ASTRONOMICAL TELESCOPES + INSTRUMENTATION | 10-15 JUNE 2018
Modeling, Systems Engineering, and Project Management for Astronomy VIII
Proceedings Volume 10705 is from: Logo
SPIE ASTRONOMICAL TELESCOPES + INSTRUMENTATION
10-15 June 2018
Austin, Texas, United States
Front Matter: Volume 10705
Proc. SPIE 10705, Front Matter: Volume 10705, 1070501 (26 July 2018); doi: 10.1117/12.2505829
System Performance Modeling I
Proc. SPIE 10705, GMT aerothermal modeling validation through site measurements, 1070502 (10 July 2018); doi: 10.1117/12.2312794
Proc. SPIE 10705, Dome seeing sensitivity analysis for LSST, 1070503 (10 July 2018); doi: 10.1117/12.2312852
Proc. SPIE 10705, On the precision of aero-thermal simulations for TMT: revisited, 1070504 (10 July 2018); doi: 10.1117/12.2312865
Proc. SPIE 10705, Giant Magellan Telescope site and enclosure computational fluid dynamics modeling and analysis, 1070505 (10 July 2018); doi: 10.1117/12.2312941
Project Management I
Proc. SPIE 10705, Understanding the risk of unattended nighttime operations at W. M. Keck Observatory, 1070506 (10 July 2018); doi: 10.1117/12.2311418
Proc. SPIE 10705, A novel approach to the development of the HARMONI integral field spectrograph using structured systems thinking, 1070507 (10 July 2018); doi: 10.1117/12.2313315
Proc. SPIE 10705, Risk management system at Gemini Observatory, 1070508 (10 July 2018); doi: 10.1117/12.2313972
Proc. SPIE 10705, How to talk so your engineer will listen, how to listen so your scientist will talk: the human side of astronomical instrument development, 1070509 (10 July 2018); doi: 10.1117/12.2314087
Assembly, Integration, and Test
Proc. SPIE 10705, Delivery and integration of MEGARA at GTC: the process of going from laboratory to the telescope, 107050A (10 July 2018); doi: 10.1117/12.2311903
Proc. SPIE 10705, An overview of the LSST system integration and commission plan (Conference Presentation), 107050B (10 July 2018); doi: 10.1117/12.2313526
Proc. SPIE 10705, ESO ELT system requirements verification, 107050C (10 July 2018); doi: 10.1117/12.2313816
Proc. SPIE 10705, Integration and verification testing of the LSST camera, 107050D (10 July 2018); doi: 10.1117/12.2314017
Proc. SPIE 10705, LSST camera - integration and test subsystem: planning and status, 107050E (10 July 2018); doi: 10.1117/12.2314244
Proc. SPIE 10705, Precise alignment method for MAORY, 107050F (10 July 2018); doi: 10.1117/12.2312072
Systems Engineering
Proc. SPIE 10705, Evolving an instrument system architecture in HARMONI (Conference Presentation), 107050G (10 July 2018); doi: 10.1117/12.2313893
Proc. SPIE 10705, Maunakea spectroscopic explorer (MSE): implementing systems engineering methodology for the development of a new facility, 107050H (10 July 2018); doi: 10.1117/12.2314169
Proc. SPIE 10705, Systems engineering for the Giant Magellan Telescope, 107050I (10 July 2018); doi: 10.1117/12.2314392
Proc. SPIE 10705, Cherenkov Telescope Array (CTA) - challenges in systems engineering and project management, 107050J (10 July 2018); doi: 10.1117/12.2317639
Proc. SPIE 10705, A comparison of systems engineering challenges and practices between space and ground based astronomical projects, 107050K (10 July 2018); doi: 10.1117/12.2317712
Project Management II
Proc. SPIE 10705, The technology development programme at ESO: challenges for industry, 107050L (10 July 2018); doi: 10.1117/12.2313461
Proc. SPIE 10705, Deriving generic telescope use cases for the Cherenkov Telescope Array, 107050M (10 July 2018); doi: 10.1117/12.2312681
Proc. SPIE 10705, Operational concepts and behaviors at the Giant Magellan telescope (Conference Presentation), 107050O (10 July 2018); doi: 10.1117/12.2314507
Modeling as a Driver of Observatory Design I: Joint Session with Conferences 10700 and 10705
Proc. SPIE 10705, Monitoring LSST system performance during construction, 107050P (10 July 2018); doi: 10.1117/12.2313880
Proc. SPIE 10705, Integrated modeling under uncertainty for the James Webb Space Telescope, 107050Q (10 July 2018); doi: 10.1117/12.2314172
Modeling as a Driver of Observatory Design II: Joint Session with Conferences 10700 and 10705
Proc. SPIE 10705, Computational fluid dynamics modeling of GMT , 107050R (10 July 2018); doi: 10.1117/12.2312858
Proc. SPIE 10705, Optical performance prediction of the Thirty Meter Telescope after initial alignment using optical modeling, 107050T (10 July 2018); doi: 10.1117/12.2314351
Model Based Systems Engineering
Proc. SPIE 10705, V&V planning and execution in an integrated model-based engineering environment using MagicDraw, Syndeia, and Jira, 107050U (10 July 2018); doi: 10.1117/12.2310125
Proc. SPIE 10705, Verifying Interfaces and generating interface control documents for the alignment and phasing subsystem of the Thirty Meter Telescope from a system model in SysML, 107050V (10 July 2018); doi: 10.1117/12.2310184
Proc. SPIE 10705, The OpenSE Cookbook: a practical, recipe based collection of patterns, procedures, and best practices for executable systems engineering for the Thirty Meter Telescope, 107050W (10 July 2018); doi: 10.1117/12.2312281
Proc. SPIE 10705, The multi-object spectroscopy (MOS) observations automatized production line, 107050X (10 July 2018); doi: 10.1117/12.2312730
Proc. SPIE 10705, A system architecture approach for the Cherenkov telescope array (Conference Presentation), 107050Y (10 July 2018); doi: 10.1117/12.2313842
System Performance Modeling II
Proc. SPIE 10705, Control modeling of the fast-steering secondary mirror for GMT, 107050Z (10 July 2018); doi: 10.1117/12.2313351
Proc. SPIE 10705, The Giant Magellan Telescope integrated modeling and performance (Conference Presentation), 1070510 (10 July 2018); doi: 10.1117/12.2313866
Proc. SPIE 10705, Multivariable frequency response analysis methods for GMT motion control systems (Conference Presentation), 1070511 (10 July 2018); doi: 10.1117/12.2314019
Proc. SPIE 10705, Performance analysis tools and results for GMT primary mirror segment active support system, 1070512 (10 July 2018); doi: 10.1117/12.2314113
Proc. SPIE 10705, ELT dome and telescope: performance analysis overview, 1070513 (10 July 2018); doi: 10.1117/12.2314942
System Performance Modeling III
Proc. SPIE 10705, ELT -HIRES, the high resolution spectrograph for the ELT; end-to-end simulator: design approach and results., 1070514 (10 July 2018); doi: 10.1117/12.2312105
Proc. SPIE 10705, STOP modeling in support of a 1-meter aperture balloon based telescope, 1070515 (10 July 2018); doi: 10.1117/12.2312312
Proc. SPIE 10705, Validating the phase diversity approach for sensing NCPA in SHARK-NIR, the second-generation high-contrast imager for the Large Binocular Telescope, 1070516 (10 July 2018); doi: 10.1117/12.2313301
Poster Session
Proc. SPIE 10705, Systems engineering applied to ELT instrumentation: the GMACS case, 107051A (10 July 2018); doi: 10.1117/12.2311352
Proc. SPIE 10705, Integrating project management and systems engineering to transition to remote operations, 107051B (10 July 2018); doi: 10.1117/12.2311421
Proc. SPIE 10705, Non-blind deconvolution of the residual tip-tilt error of the Sunrise Solar Observatory, 107051D (10 July 2018); doi: 10.1117/12.2311652
Proc. SPIE 10705, Radial velocity accuracy prediction of the GREGOR at night spectrograph based on simulated spectra, 107051E (10 July 2018); doi: 10.1117/12.2311715
Proc. SPIE 10705, The integration and verification of the power and mechanism control unit of the VIS instrument for the Euclid space mission, 107051F (10 July 2018); doi: 10.1117/12.2312143
Proc. SPIE 10705, Flexure compensation simulation tool for TMT-WFOS Spectrograph, 107051G (10 July 2018); doi: 10.1117/12.2312155
Proc. SPIE 10705, Initial on-site measurements at potential observatory sites within the United Arab Emirates, 107051J (10 July 2018); doi: 10.1117/12.2312392
Proc. SPIE 10705, Analysis of mode excitation on different geometries of optical fibres for astronomical spectroscopy, 107051K (10 July 2018); doi: 10.1117/12.2312487
Proc. SPIE 10705, Giant Magellan Telescope enclosure thermal modeling and simulation, 107051M (10 July 2018); doi: 10.1117/12.2312857
Proc. SPIE 10705, Ground layer studies for the alternate TMT site, 107051N (10 July 2018); doi: 10.1117/12.2313039
Proc. SPIE 10705, Modeling and budgeting fiber injection efficiency for the Maunakea Spectroscopic Explorer (MSE), 107051O (10 July 2018); doi: 10.1117/12.2313048