29 November 2021 Implementation of module for 10kV substation total power-off recovery in distribution networks
Wei Si, Guoqiang Zu, Enjie Zhang
Author Affiliations +
Proceedings Volume 12080, 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021); 120804B (2021) https://doi.org/10.1117/12.2619459
Event: 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021), 2021, Nanchang, China
Abstract
At present, it is feasible to deal with large-scale power outage in distribution network. However, there are still many problems in dealing with power outage, such as the huge workload of manual preparation of contingency plan, the changeable operation mode, the difficulty of emergency plan maintenance, the large number of remote control switches, and the long time-consuming. Through the study of large-area power failure treatment technology of distribution network, the improvement method is proposed to break the existing bottleneck.Only after the software that can treat large-area power failure of distribution network is developed, the large-area power failure treatment technology based on distribution network becomes practical.
© (2021) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Wei Si, Guoqiang Zu, and Enjie Zhang "Implementation of module for 10kV substation total power-off recovery in distribution networks", Proc. SPIE 12080, 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021), 120804B (29 November 2021); https://doi.org/10.1117/12.2619459
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Power supplies

Switches

Failure analysis

Reconstruction algorithms

Information operations

Reliability

Computer simulations

Back to Top