Poster + Paper
27 August 2022 James Webb Space Telescope wavefront commissioning contingency response
Author Affiliations +
Conference Poster
Abstract
Commissioning the Webb telescope to realize the observatory’s full capability necessitated the development of robust wavefront sensing and control processes. These processes rely on techniques that were adapted or newly innovated for the mission, and further adaptation of these techniques may be expected for future segmented telescopes. Over the course of mission development, these techniques were refined to form a baseline wavefront commissioning plan that assumes several conditions and performance requirements are met. Herein we present efforts carried out to define and develop contingency concepts of operation for Webb telescope commissioning, and the mission-level approach to managing the response to deviations from the baseline plan in the event of significant off-nominal or anomaly scenarios encountered by the wavefront team. An overview of selected contingencies is presented along with more detailed example model cases and instances of interest encountered in flight.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Brian A. Hicks, Taylor Chonis, Eric Coppock, Michael S. Gordon, Katherine Melbourne, Gregory D. Wirth, Erin Wolf, D. Scott Acton, Brian Bauer, Maria Carrasquilla, Lee Feinberg, J. Scott Knight, Derek Sabatke, Chanda Walker, Garrett West, and Ray H. Wright "James Webb Space Telescope wavefront commissioning contingency response", Proc. SPIE 12180, Space Telescopes and Instrumentation 2022: Optical, Infrared, and Millimeter Wave, 121803U (27 August 2022); https://doi.org/10.1117/12.2630359
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Sensors

Mirrors

Actuators

Wavefront sensors

James Webb Space Telescope

Phase retrieval

RELATED CONTENT

Phasing the Webb Telescope
Proceedings of SPIE (August 27 2022)
Hartmann testing and vibration for RST (WFIRST)
Proceedings of SPIE (August 20 2020)
TRL-6 for JWST wavefront sensing and control
Proceedings of SPIE (September 20 2007)

Back to Top