Paper
1 July 1990 3.5-m mirror project at NOAO
Author Affiliations +
Abstract
The National Optical Astronomy Observatories (NOAO) have been working for several years to develop the technology for 8-m telescopes using structured borosilicate glass primary mirrors. In March 1989 the final stage in this technology development program began with the delivery of a 3.5-m mirror blank, cast under NOAO contract at the University of Arizona Mirror Lab. The project will have four phases: (1) initial fabrication, (2) testing of support and thermal systems, (3) aspherizing the mirror and rework of the support and thermal systems, and (4) final acceptance test. At the conclusion of this effort there will be a finished 3.5-m f/1.75 mirror, which will then become the heart of the new WIN telescope on Kitt Peak.
© (1990) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Larry M. Stepp "3.5-m mirror project at NOAO", Proc. SPIE 1236, Advanced Technology Optical Telescopes IV, (1 July 1990); https://doi.org/10.1117/12.19231
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Telescopes

Polishing

Optical testing

Distortion

Control systems

Active optics

RELATED CONTENT


Back to Top