The design for the Columbus binocular telescope has been completed and the project is now proceeding to the construction phase. The two 8-m f/1.2 borosilicate honeycomb mirrors will give an effective collecting area of 11.3 m and a baseline of 22 m for interferometry. The optics are supported on an exceedingly compact and rigid 'C-ring' mount with a lowest eigenfrequency of around 10 Hz. The system will be housed in a corotating enclosure and will be located on Mt. Graham in southeastern Arizona. Instrumentation priorities have been established for the telescope and conceptual designs are now under development.
© (1990) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Peter A. Strittmatter "Columbus Project Telescope", Proc. SPIE 1236, Advanced Technology Optical Telescopes IV, (1 July 1990); https://doi.org/10.1117/12.19178
PROCEEDINGS
14 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

MMT conversion: a status report
Proceedings of SPIE (July 01 1990)
Concept and design of the 2.0 m NGAT the...
Proceedings of SPIE (August 25 1998)
Infrared optimized AO system for a 15 to 20...
Proceedings of SPIE (February 04 2003)
Large Binocular Telescope Project
Proceedings of SPIE (August 25 1998)

Back to Top