1 February 1992 Centralized power architectures and costs
Mark Vogel, Linda F. Garbanati
Author Affiliations +
Abstract
Currently, most regional Bell operating companies (RBOCs) favor centralized powering as the predominant method for powering fiber-in-the-loop (FITL) systems. This is because centralized power systems can provide indefinite power backup, as well as consolidation of power equipment and batteries. The capabilities of such a power system are dependent on several parameters including supply cable gauge, load requirements, and equipment location. This paper examines two centralized powering architectures and determines the impact of these parameters on the installed first cost of the power system. The paper also provides a review of the anticipated narrowband FITL power requirements and specifications.
© (1992) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Mark Vogel and Linda F. Garbanati "Centralized power architectures and costs", Proc. SPIE 1578, Fiber Networks for Telephony and CATV, (1 February 1992); https://doi.org/10.1117/12.134942
Lens.org Logo
CITATIONS
Cited by 3 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Stars

Electronics

Carbon monoxide

Radon

Network architectures

Distance measurement

Fiber in the loop

RELATED CONTENT


Back to Top