Translator Disclaimer
8 June 1995 Control system developments for the Isaac Newton Group of telescopes
Author Affiliations +
Abstract
A number of improvements have been made to the servo control systems of the 4.2 m William Herschel Telescope (WHT) at the Isaac Newton Group of telescopes on La Palma in the Canary Islands. The successful upgrading of both the Cassegrain and prime focus rotators to meet more stringent science and engineering requirements is described. Simulation (using MatlabR and SimulinkR) of a model reference adaptive controller to improve azimuth tracking in the presence of torque disturbances is presented together with some preliminary results and a discussion of the way forward. Further enhancements to the WHT's subsystems are also discussed. The smaller 2.5 m Isaac Newton Telescope (INT) and the 1 m Jacobus Kapteyn Telescope (JKT) are also being considered for major improvements to their drives and encoders. Studies are being carried out to determine the requirements and appropriate goals of such improvements and whether modern control approaches can offer cost-effective solutions with minimal re-engineering work. The current performance, generally pointing and tracking, of these telescopes is presented and the subsystems which limit performance are examined; these may be drives, encoders, mirror supports, and structural components. A range of solutions is considered and the technical proposals developed so far are discussed.
© (1995) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Martin Fisher, John D. Wilkes, and Clive S. Amos "Control system developments for the Isaac Newton Group of telescopes", Proc. SPIE 2479, Telescope Control Systems, (8 June 1995); doi: 10.1117/12.211440; https://doi.org/10.1117/12.211440
PROCEEDINGS
14 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Study on H-Infinity control for LAMOST main axes
Proceedings of SPIE (July 05 2006)
Gemini mount control system: description and progress
Proceedings of SPIE (September 17 1997)
Time to go H-∞
Proceedings of SPIE (September 14 2004)
Integration and tuning of the VLT drive systems
Proceedings of SPIE (August 01 2000)

Back to Top