28 August 1995 DYNAS3: a dynamic scheduling system for job scheduling
Author Affiliations +
Proceedings Volume 2620, International Conference on Intelligent Manufacturing; (1995) https://doi.org/10.1117/12.217478
Event: International Conference on Intelligent Manufacturing, 1995, Wuhan, China
Abstract
This paper is concerned with the development of a dynamic scheduling system for job scheduling, named DYNAS3. Though many scheduling criteria for job scheduling have been proposed, most of them are impractical for use in the low-volume/high-variety manufacturing environment. DYNAS3 is a scheduling system for job scheduling in a low-volume/high- variety manufacturing environment, developed by using client/server computing technology. The system provides us with a practical facility for job scheduling which takes into account the influence of many factors such as machine setup times, cell changes, replacement machines, and load balancing between machines. Numerical testing examples are taken from a real- manufacturing factory of Japan, and high-quality results are efficiently generated.
© (1995) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
YaoXue Zhang, YaoXue Zhang, GuangJie Li, GuangJie Li, Shuo Di, Shuo Di, Hua Cheng, Hua Cheng, KangFu Cheng, KangFu Cheng, } "DYNAS3: a dynamic scheduling system for job scheduling", Proc. SPIE 2620, International Conference on Intelligent Manufacturing, (28 August 1995); doi: 10.1117/12.217478; https://doi.org/10.1117/12.217478
PROCEEDINGS
7 PAGES


SHARE
Back to Top