Paper
28 August 1995 Stochastic scheduling on a repairable manufacturing system
Wei Li, Jinhua Cao
Author Affiliations +
Proceedings Volume 2620, International Conference on Intelligent Manufacturing; (1995) https://doi.org/10.1117/12.217486
Event: International Conference on Intelligent Manufacturing, 1995, Wuhan, China
Abstract
In this paper, we consider some stochastic scheduling problems with a set of stochastic jobs on a manufacturing system with a single machine that is subject to multiple breakdowns and repairs. When the machine processing a job fails, the job processing must restart some time later when the machine is repaired. For this typical manufacturing system, we find the optimal policies that minimize the following objective functions: (1) the weighed sum of the completion times; (2) the weighed number of late jobs having constant due dates; (3) the weighted number of late jobs having random due dates exponentially distributed, which generalize some previous results.
© (1995) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Wei Li and Jinhua Cao "Stochastic scheduling on a repairable manufacturing system", Proc. SPIE 2620, International Conference on Intelligent Manufacturing, (28 August 1995); https://doi.org/10.1117/12.217486
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Stochastic processes

Manufacturing

Astatine

Applied mathematics

Lithium

Sun

Systems modeling

Back to Top