Construction of the Gemini Telescopes is underway. The first mirror blank has been completed, concrete piers on both Mauna Kea and Cerro Pachon have been poured, fabrication of the telescope structures has started and the erection of the first enclosures have begun. In this paper, we give a progress report on the Gemini 8-M Telescopes Project. In addition, we highlight some of the unique scientific characteristics of the Gemini Telescopes including our approach to image quality performance, the use infrared wavefront sensors, the development of silver coatings and our 'adaptable observing' system. The scientific performance of these telescopes will be heavily dependent on atmospheric conditions, Gemini will be allocating at least 50% of its observing time to 'queue scheduled observing.' The implications of adopting this novel observing mode on the design of the control system and on the telescope operations model are briefly discussed.
© (1997) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
C. Matt Mountain, Fred C. Gillett, and Richard Kurz "Gemini 8-m Telescopes Project", Proc. SPIE 2871, Optical Telescopes of Today and Tomorrow, (21 March 1997); https://doi.org/10.1117/12.269047
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Gemini Observatory

Mirrors

Image quality

Silver

Infrared telescopes

Infrared imaging

RELATED CONTENT

Optical design concept of the 4 m visible and infrared...
Proceedings of SPIE (January 30 2003)
Gemini 8-m telescopes project
Proceedings of SPIE (June 01 1994)
Infrared optimized AO system for a 15 to 20...
Proceedings of SPIE (February 04 2003)
Pre-launch characterization of the WISE payload
Proceedings of SPIE (August 05 2010)
Optical Design And Instrumentation Of The Keck Observatory
Proceedings of SPIE (August 20 1986)

Back to Top