PROCEEDINGS VOLUME 3112
OPTICAL SCIENCE, ENGINEERING AND INSTRUMENTATION '97 | 27 JULY - 1 AUGUST 1997
Telescope Control Systems II
OPTICAL SCIENCE, ENGINEERING AND INSTRUMENTATION '97
27 July - 1 August 1997
San Diego, CA, United States
Telescope Status
Proc. SPIE 3112, Progress on the UKIRT upgrades program, 0000 (18 September 1997); doi: 10.1117/12.284221
Proc. SPIE 3112, NTT project: a field test of the VLT software and hardware, 0000 (18 September 1997); doi: 10.1117/12.284225
Proc. SPIE 3112, Preparation for VLT software commissioning at Paranal, 0000 (18 September 1997); doi: 10.1117/12.278833
Encoders and Servos
Proc. SPIE 3112, Selection of a tape encoding system for the main axis of the Gemini telescopes, 0000 (18 September 1997); doi: 10.1117/12.278836
Proc. SPIE 3112, Tests of incremental rotary encoders, 0000 (18 September 1997); doi: 10.1117/12.278837
Support Software
Proc. SPIE 3112, Testing, debugging, and development environment of the Subaru Observation Software System, 0000 (18 September 1997); doi: 10.1117/12.284222
Proc. SPIE 3112, VLT data flow system: the NTT prototype experience, 0000 (18 September 1997); doi: 10.1117/12.284223
Proc. SPIE 3112, Route-finding algorithm for the optimal control of telescope slews, 0000 (18 September 1997); doi: 10.1117/12.278815
Remote Observing
Proc. SPIE 3112, BIMA data archive: the architecture and implementation of a real-time telescope archiving system, 0000 (18 September 1997); doi: 10.1117/12.278816
Proc. SPIE 3112, Remote observing with the Keck Telescopes, 0000 (18 September 1997); doi: 10.1117/12.278817
Proc. SPIE 3112, Remote phasing of the Multiple-Mirror Telescope with far-field optimization, 0000 (18 September 1997); doi: 10.1117/12.284224
Telescope Control Systems
Proc. SPIE 3112, Portable telescope control system project, 0000 (18 September 1997); doi: 10.1117/12.278818
Proc. SPIE 3112, Large Binocular Telescope: the control system of the position actuator of the 8.4-m borosilicate honeycomb primary mirrors, 0000 (18 September 1997); doi: 10.1117/12.278819
Proc. SPIE 3112, Integration tests of the VLT telescope control system, 0000 (18 September 1997); doi: 10.1117/12.284226
Proc. SPIE 3112, User interface for the control of the Gemini Telescopes, 0000 (18 September 1997); doi: 10.1117/12.278820
Ancillary Control Systems
Proc. SPIE 3112, Chopping secondary mirror control systems for the W. M. Keck Telescopes, 0000 (18 September 1997); doi: 10.1117/12.284227
Proc. SPIE 3112, Position control for active secondary mirror of a two-mirror telescope, 0000 (18 September 1997); doi: 10.1117/12.278821
Proc. SPIE 3112, Control of the Gemini Cassegrain rotator, 0000 (18 September 1997); doi: 10.1117/12.278822
Proc. SPIE 3112, User interface and control software for the HIRES image rotator on Keck-1, 0000 (18 September 1997); doi: 10.1117/12.284228
Instrument Control Systems
Proc. SPIE 3112, Michelle Edict midinfrared control and data acquisition system for use on UKIRT and Gemini, 0000 (18 September 1997); doi: 10.1117/12.278823
Observing Scheduling and Planning
Proc. SPIE 3112, Control software and scheduling of the Liverpool Robotic Telescope, 0000 (18 September 1997); doi: 10.1117/12.278824
Proc. SPIE 3112, Execution of queue-scheduled observations with the Gemini 8-m telescopes, 0000 (18 September 1997); doi: 10.1117/12.278825
Proc. SPIE 3112, Science planning for the Gemini 8-m telescopes, 0000 (18 September 1997); doi: 10.1117/12.278826
Poster Session
Proc. SPIE 3112, Communications challenge for the Gemini 8-m telescopes, 0000 (18 September 1997); doi: 10.1117/12.284229
Proc. SPIE 3112, Control system of the FOCAS instrument for the Subaru Telescope, 0000 (18 September 1997); doi: 10.1117/12.278827
Proc. SPIE 3112, NASA IRTF tip-tilt secondary system, 0000 (18 September 1997); doi: 10.1117/12.278828
Proc. SPIE 3112, Subaru observation control system, 0000 (18 September 1997); doi: 10.1117/12.278829
Proc. SPIE 3112, Possible control and testing of concave telescope mirrors, 0000 (18 September 1997); doi: 10.1117/12.278830
Proc. SPIE 3112, UKIRT fast guide system improvements, 0000 (18 September 1997); doi: 10.1117/12.287767
Proc. SPIE 3112, Gemini mount control system: description and progress, 0000 (18 September 1997); doi: 10.1117/12.278831
Support Software
Proc. SPIE 3112, Data quality assessment database and a World Wide Web interface for the Hubble Space Telescope, 0000 (18 September 1997); doi: 10.1117/12.278832
Poster Session
Proc. SPIE 3112, Robust guide-star tracking algorithm proposed for Gravity Probe-B relativity mission, 0000 (18 September 1997); doi: 10.1117/12.278834
Instrument Control Systems
Proc. SPIE 3112, Remote observing with the Keck Telescope from California using NASA's ACTS satellite, 0000 (18 September 1997); doi: 10.1117/12.278835
Poster Session
Proc. SPIE 3112, Galileo high-resolution encoder system, 0000 (18 September 1997); doi: 10.1117/12.284230
Proc. SPIE 3112, Neural variable structure controller for telescope pointing and tracking improvement, 0000 (18 September 1997); doi: 10.1117/12.284231
Proc. SPIE 3112, Galileo Telescope model identification, 0000 (18 September 1997); doi: 10.1117/12.284232
Back to Top