2 January 1998 Bit-delay analysis of a duplex byte-wide WDM optical link in the low loss transmission windows
Author Affiliations +
Proceedings Volume 3211, International Conference on Fiber Optics and Photonics: Selected Papers from Photonics India '96; (1998) https://doi.org/10.1117/12.345591
Event: International Conference on Fiber Optics and Photonics: Selected Papers from Photonics India '96, 1996, Madras, India
Abstract
With the advent of ultra high speed optical communication systems, it has become important to investigate the bit delay associtaed with each channel of a Byte-Wide WDM system. In this paper, the relative bit-delay caused by different transmission wavelengths in a Byte-wide WDM optical system have been analysed and estimated for low loss transmission windows (1.3 &1.5 µm). Byte-rate limitation imposed upon WDM system has been investigated. Further, Scheme for duplex Byte-wide WDM system for an Optical Line Terminal Equipment (OLTE) has been proposed.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Ajay K. Sharma, Ajay K. Sharma, Randhir K. Sinha, Randhir K. Sinha, R. A. Agarwala, R. A. Agarwala, } "Bit-delay analysis of a duplex byte-wide WDM optical link in the low loss transmission windows", Proc. SPIE 3211, International Conference on Fiber Optics and Photonics: Selected Papers from Photonics India '96, (2 January 1998); doi: 10.1117/12.345591; https://doi.org/10.1117/12.345591
PROCEEDINGS
7 PAGES


SHARE
RELATED CONTENT

Plastic fiber gratings
Proceedings of SPIE (October 08 2000)
QoS classification-based assembly algorithm in OBS network
Proceedings of SPIE (October 02 2006)
Task scheduling algorithm for optical grid architecture
Proceedings of SPIE (September 27 2006)

Back to Top