Paper
13 July 1998 Role of a project leader in implementing a hospital-wide PACS
Nicola H. Strickland
Author Affiliations +
Abstract
The role of the Project Leader in implementing a hospital-wide PACS is to lead the PACS Project Team. This involves ensuring that the structure of this team fairly represents the entire hospital, convening regular Project Team meetings, chairing these meetings and drawing up their agenda and documenting their minutes. Between meetings the Project Leader must follow up action items, verifying that they are being implemented in a timely fashion. The Project Leader is ultimately responsible for the decisions of the Project Team, in particular the assessment of the progress of the whole project, step by step. Experience of the implementation of the Hammersmith Hospital PACS is described in relation to the role of the Project Leader and Project Team.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Nicola H. Strickland "Role of a project leader in implementing a hospital-wide PACS", Proc. SPIE 3339, Medical Imaging 1998: PACS Design and Evaluation: Engineering and Clinical Issues, (13 July 1998); https://doi.org/10.1117/12.319803
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Picture Archiving and Communication System

Information technology

Lead

Imaging systems

Medicine

Diagnostics

Glasses

RELATED CONTENT


Back to Top