3 July 1998 Data Flow System operations: from the NTT to the VLT
Author Affiliations +
Abstract
Science operations at the ESO very large telescope is scheduled to begin in April 1999. ESO is currently finalizing the VLT science operations plan. This plan describes the operations tasks and staffing needed to support both visitor and service mode operations. The Data Flow Systems (DFS) currently being developed by ESO will provide the infrastructure necessary for VLT science operations. This paper describes the current VLT science operations plan, first by discussing the tasks involved and then by describing the operations teams that have responsibility for those tasks. Prototypes of many of these operational concepts and tools have been in use at the ESO New Technology Telescope (NTT) since February 1997. This paper briefly summarizes the status of these prototypes and then discusses what operation lessons have been learned from the NTT experience and how they can be applied to the VLT.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
David R. Silva, David R. Silva, Bruno Leibundgut, Bruno Leibundgut, Peter J. Quinn, Peter J. Quinn, Jason Spyromilio, Jason Spyromilio, Massimo Tarenghi, Massimo Tarenghi, } "Data Flow System operations: from the NTT to the VLT", Proc. SPIE 3349, Observatory Operations to Optimize Scientific Return, (3 July 1998); doi: 10.1117/12.316484; https://doi.org/10.1117/12.316484
PROCEEDINGS
10 PAGES


SHARE
RELATED CONTENT

The ASTRI/CTA mini-array software system
Proceedings of SPIE (July 17 2014)
Design of the VLT data flow model
Proceedings of SPIE (March 20 1997)
VLT data flow system: the NTT prototype experience
Proceedings of SPIE (September 17 1997)
Archive systems for the TNG telescope lessons learned in...
Proceedings of SPIE (December 15 2002)

Back to Top