Translator Disclaimer
2 October 1998 MBI facility at BESSY II for time-resolved pump-probe techniques with laser and undulator radiation
Author Affiliations +
Abstract
The MBI develops a facility at BESSY II dedicated to pump- probe techniques combining synchrotron and laser radiation. The synchronization of laser and synchrotron pulses will allow time resolved experiments on the picosecond time scale at this. The features of the facility, the optical parameters of the synchrotron beamline, the synchronization technique and pulse stretching considerations will be outlined. Current developments will be reported.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Johannes Gatzke, Bernd J. Winter, T. Quast, and Ingolf V. Hertel "MBI facility at BESSY II for time-resolved pump-probe techniques with laser and undulator radiation", Proc. SPIE 3464, Optical Devices and Methods for Microwave/Millimeter-Wave and Frontier Applications, (2 October 1998); https://doi.org/10.1117/12.323150
PROCEEDINGS
6 PAGES


SHARE
Advertisement
Advertisement
Back to Top