25 July 2000 Baseline of the GTC operation and maintenance plan
Author Affiliations +
Abstract
In order to maximize the science return while minimizing running cost, the operational and maintenance requirements are being considered during the design of the GTC. Following this adopted integrated logistic support approach; GTC has produced the baselines of the GTC Operation and Maintenance Plans. These plans describe the science operation strategies, in particular those regarding the queue schedule mode, which will play the main role in the GTC operation scenario. Also the Operation and Maintenance Plans describe the maintenance activities and the support elements (staff, handling equipment, facilities...) that are being currently defined for the GTC future operational phase. This paper briefly summarizes the main items included in the Baselines of the GTC Operation and Maintenance Plans.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Ana Perez-Calpena and Juan Paris P. Gonzalez "Baseline of the GTC operation and maintenance plan", Proc. SPIE 4010, Observatory Operations to Optimize Scientific Return II, (25 July 2000); https://doi.org/10.1117/12.392509
PROCEEDINGS
12 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

User support: lessons learned from HST
Proceedings of SPIE (July 02 1998)
Data Flow System operations from the NTT to the...
Proceedings of SPIE (July 02 1998)
OmegaCAM the 16k x 16k survey camera for the VLT...
Proceedings of SPIE (December 23 2002)
VISTA data flow system: overview
Proceedings of SPIE (September 15 2004)
ESO scalable architecture for operational databases
Proceedings of SPIE (July 11 2008)

Back to Top