28 July 2000 Lockheed Martin team's Next Generation Space Telescope (NGST) reference architecture
Author Affiliations +
Abstract
An overview of the Lockheed Martin Team's NGST Reference Architecture is discussed. Our f/1 NGST concept includes a lightweight 8-meter primary mirror consisting of eight deployed petals. Alignment and figure control employs wavefront-sensing techniques. Infrared observations are enabled by using a tennis court size multi-layer deployed sunshield permitting the primary mirror to be passively cooled to < 40 K. Candidate Science Instruments cover the spectral range from 0.6 microns to greater than 20 microns. The Integrated Science Instrument Module (ISIM) is passively cooled to approximately 30 K. The Observatory is launched on an AtlasV-531M in 2008 and operates at the L2 LaGrange Point. Science Planning and Mission Operations are the responsibility of the Space Telescope Science Institute in Baltimore Maryland. The ISIM is the responsibility of Goddard Space Flight Center (GSFC). The Lockheed Martin Team, including Raytheon, Honeywell, and Jackson and Tull, is an NGST Phase 1 Prime Contractor. The GSFC manages the NGST Project in Greenbelt Maryland.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Frank Martin, Lawrence Lesyna, Robert J. LeRoy, Michael T. Menzel, Gregory C. Andersen, Brent Hyatt, Kenneth J. Triebes, Chuck Rudiger, Mark T. Stier, Charles D. Cox, Charles D. Delp, Roman Hachkowski, George B. Hardman, Michael J. Keane, Malcolm J. MacFarlane, Anthony Mordino, Michael H. Krim, "Lockheed Martin team's Next Generation Space Telescope (NGST) reference architecture", Proc. SPIE 4013, UV, Optical, and IR Space Telescopes and Instruments, (28 July 2000); doi: 10.1117/12.394043; https://doi.org/10.1117/12.394043
PROCEEDINGS
10 PAGES


SHARE
RELATED CONTENT

Recent progress with the JWST Observatory
Proceedings of SPIE (August 02 2014)
The JWST science instrument payload: mission context and status
Proceedings of SPIE (September 26 2013)
Status of the ESA L1 mission candidate ATHENA
Proceedings of SPIE (September 25 2012)
Cooling large space telescopes to 4 kelvin
Proceedings of SPIE (August 18 2005)
JWST NIRSpec mechanical design
Proceedings of SPIE (July 23 2008)
SIRTF telescope test facility: the first year
Proceedings of SPIE (October 14 1996)

Back to Top