27 July 2001 SPANR planning and scheduling
Author Affiliations +
Proceedings Volume 4528, Commercial Applications for High-Performance Computing; (2001) https://doi.org/10.1117/12.434874
Event: ITCom 2001: International Symposium on the Convergence of IT and Communications, 2001, Denver, CO, United States
Abstract
SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.
© (2001) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Richard F. Freund, Richard F. Freund, Tracy D. Braun, Tracy D. Braun, Matthew Kussow, Matthew Kussow, Michael Godfrey, Michael Godfrey, Terry Koyama, Terry Koyama, } "SPANR planning and scheduling", Proc. SPIE 4528, Commercial Applications for High-Performance Computing, (27 July 2001); doi: 10.1117/12.434874; https://doi.org/10.1117/12.434874
PROCEEDINGS
8 PAGES


SHARE
Back to Top