Translator Disclaimer
7 March 2003 Gemini Observatory's Facility Instrument Program
Author Affiliations +
Abstract
This is the fourth in a series of SPIE papers that chronicle the accomplishments, challenges, and evolution of Gemini's instrumentation program. For the first time we are pleased to report about progress made on instruments being fabricated as well as results with completed instruments, now steadily producing world-class scientific results at the Gemini Observatory. With the steady arrival of new facility class instruments, we anticipate phasing out our reliance on visitor instruments, which have enabled our early scientific capabilities at both Gemini-N and Gemini-S. Currently two facility class instruments are operational and six more are due in roughly a year, hence commissioning all of these instruments in Hawaii and Chile will doubtless be an enormous task for the staff at Gemini in the near future.
© (2003) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Douglas A. Simons, Robert Nolan, Manuel Lazo, Wendy Mays, Ian M. Richardson, and Luis Solis "Gemini Observatory's Facility Instrument Program", Proc. SPIE 4841, Instrument Design and Performance for Optical/Infrared Ground-based Telescopes, (7 March 2003); https://doi.org/10.1117/12.461031
PROCEEDINGS
12 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Project management of DAG: Eastern Anatolia Observatory
Proceedings of SPIE (August 19 2016)
Instrumentation for the Thirty Meter Telescope
Proceedings of SPIE (September 30 2004)
Update on optical design of adaptive optics system at Lick...
Proceedings of SPIE (February 04 2002)
Gemini instrument program
Proceedings of SPIE (August 16 2000)

Back to Top