12 October 2004 An overview of the James Webb Space Telescope (JWST) project
Author Affiliations +
Abstract
The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Phillip A. Sabelhaus, Phillip A. Sabelhaus, John E. Decker, John E. Decker, } "An overview of the James Webb Space Telescope (JWST) project", Proc. SPIE 5487, Optical, Infrared, and Millimeter Space Telescopes, (12 October 2004); doi: 10.1117/12.549895; https://doi.org/10.1117/12.549895
PROCEEDINGS
14 PAGES


SHARE
Back to Top