28 September 2004 SOAR 4.1-m Telescope: from commissioning to early science
Author Affiliations +
Abstract
Development of the 4.1 meter SOuthern Astrophysical Research (SOAR) Telescope is now complete. All baseline systems are in place and extensive commissioning activities have been performed with and without the primary optics installed in the telescope. The facility and dome have been under observatory operations and TCS control for a year of testing and tuning. The altitude over azimuth telescope mount was integrated on the mountain in a rapid 3-month period due to the complete assembly and testing performed at the factory prior to delivery. Early mount testing and successful integration into the Telescope Control System (TCS) without the optical system was accomplished on the sky through use of two separate small aperture telescopes fixed to the structure. One of these, the "feed telescope" was also pivotal in early testing of the calibration wavefront sensor and SOAR optical imager by directing focused light to these separate instruments. The SOAR optical system, with its 4.1 meter clear aperture, 100 cm thick, ULEtm primary mirror, its lightweight ULEtm secondary, and its fast tip tilt ULEtm tertiary has been delivered and installed in the telescope. This system was also assembled as an electrically connected system and individually optically tested under a visible interferometer at the factory enabling rapid integration and a short commissioning period on telescope. In this paper we present the project status, a summary of the commissioning period, and the performance data for the completed telescope and its major components.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Victor L. Krabbendam, Victor L. Krabbendam, Stephen Heathcote, Stephen Heathcote, German Schumacher, German Schumacher, Hugo E. Schwarz, Hugo E. Schwarz, Thomas A. Sebring, Thomas A. Sebring, Michael Warner, Michael Warner, } "SOAR 4.1-m Telescope: from commissioning to early science", Proc. SPIE 5489, Ground-based Telescopes, (28 September 2004); doi: 10.1117/12.552602; https://doi.org/10.1117/12.552602
PROCEEDINGS
10 PAGES


SHARE
RELATED CONTENT

LSST Telescope and site status
Proceedings of SPIE (July 21 2014)
Altair interactions
Proceedings of SPIE (September 14 2004)
Gemini MCAO control system
Proceedings of SPIE (February 03 2002)
Wavefront control system for the Keck telescope
Proceedings of SPIE (September 10 1998)
A Near Infrared Astronomical Adaptive Optics System
Proceedings of SPIE (September 19 1989)
Innovations in Gemini adaptive optics system design
Proceedings of SPIE (September 10 1998)

Back to Top