Paper
20 October 2004 Selection of an optimum subset of telescope configurations for the VLT Interferometer
Author Affiliations +
Abstract
The Very Large Telescope Interferometer (VLTI) makes in its final configuration use of four 1.8m Auxiliary Telescopes, which can be located on 30 different stations. These four telescopes can theoretically be arranged in more than 25,000 different configurations. Of course, operational constraints will allow only some dozens of these configurations to be realized over the entire lifetime of the interferometer. Furthermore, there are restrictions on sky accessibility posed by both physical limits of the delay lines and vignetting by the 8.2m telescope enclosures. We describe criteria for an optimum selection of configurations and propose a subset of AT stations to be offered for science operations with the VLTI.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Emmanuel Galliano, Markus Schoeller, Michael D. Fischer, Christian A. Hummel, Sebastien Morel, Fredrik T. Rantakyro, and Martin Vannier "Selection of an optimum subset of telescope configurations for the VLT Interferometer", Proc. SPIE 5491, New Frontiers in Stellar Interferometry, (20 October 2004); https://doi.org/10.1117/12.550348
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Interferometers

Vignetting

Large telescopes

Astatine

Interferometry

Observatories

RELATED CONTENT

VLTI status update: a decade of operations and beyond
Proceedings of SPIE (July 24 2014)
The Michelson-Pease centennial
Proceedings of SPIE (December 13 2020)
The Very Large Telescope Interferometer: an update
Proceedings of SPIE (July 28 2008)
Data flow system for the very large telescope interferometer
Proceedings of SPIE (November 01 2001)
The Very Large Telescope Interferometer v2012+
Proceedings of SPIE (September 12 2012)
The VLTI Auxiliary Telescopes: commissioning of AT1
Proceedings of SPIE (October 20 2004)
Status of the VLTI-UT performances wrt vibrations
Proceedings of SPIE (July 21 2010)

Back to Top