Translator Disclaimer
30 September 2004 bHROS installation and system performance
Author Affiliations +
Abstract
The Gemini bHROS instrument, (Bench-Mounted High Resolution Optical Spectrograph) was delivered to the Gemini South Telescope in March 2003, after passing it's onsite acceptance test at UCL (University College London). The instrument was installed through the 2003 period, getting its final components, the fibre system, in September of that year. A number of nights were then allocated to the instrument to verify it throughput. This paper discusses the installation of the bHROS system in the pier lab and the difficulties encountered getting an accurate measure of the throughput of the system. An overview of the measured performance of the instrument and details of additional, proposed, system enhancements is given and an indication of the timescales for its release to the astronomical community is discussed.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Margaret E. Aderin "bHROS installation and system performance", Proc. SPIE 5492, Ground-based Instrumentation for Astronomy, (30 September 2004); https://doi.org/10.1117/12.550960
PROCEEDINGS
12 PAGES


SHARE
Advertisement
Advertisement
Back to Top