29 September 2004 SOAR Telescope: 4-meter high-performance-mount performance results
Author Affiliations +
Abstract
The 4.1-meter SOuthern Astrophysical Research (SOAR) Telescope mount and drive systems have been commissioned and are in routine operation. The telescope mount, the structure and its full drive systems, was fully erected and tested at the factory prior to reassembly and commissioning at the observatory. This successful approach enabled complete integration, from a concrete pier to a pointing and tracking telescope, on the mountain, in a rapid 3-month period. The telescope mount with its high instrument payload and demanding efficiency requirements is an important component for the success of the SOAR scientific mission. The SOAR mount utilizes rolling element bearings for both azimuth and elevation support, counter torqued sets of gear motors on azimuth and two frameless torque motors built into the elevation axles. Tracking jitter and its associated spectra, pointing errors and their sources, bearing friction and servo performances are critical criteria for this mount concept and are important factors in achieving the mission. This paper addresses the performance results obtained during the integration, commissioning, and first light periods of the telescope mount system.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Michael Warner, Michael Warner, Victor Krabbendam, Victor Krabbendam, German Schumacher, German Schumacher, Juan C. Delgadillo, Juan C. Delgadillo, } "SOAR Telescope: 4-meter high-performance-mount performance results", Proc. SPIE 5495, Astronomical Structures and Mechanisms Technology, (29 September 2004); doi: 10.1117/12.552601; https://doi.org/10.1117/12.552601
PROCEEDINGS
10 PAGES


SHARE
RELATED CONTENT

LSST telescope and site status
Proceedings of SPIE (July 26 2016)
INT prime focus mosaic camera
Proceedings of SPIE (March 24 1996)

Back to Top