8 February 2005 Packet transfer delay analysis of the RPR rings in the store-and-forward architecture
Author Affiliations +
Proceedings Volume 5626, Network Architectures, Management, and Applications II; (2005); doi: 10.1117/12.573515
Event: Asia-Pacific Optical Communications, 2004, Beijing, China
Abstract
RRP has two means to transmit data: store-and-forward and cut-through. In this paper, the high and low priority packet transfer delay of the N nodes Resilient Packet Rings (RPR) in store-and-forward architecture is analyzed based on the queuing theory. According to queuing theory, we set up the nodes model and analyzed the factors that influenced the packet transfer delay in a constrained condition. By calculation and simulation, the result indicates that both high priority and low priority packets’ delay increase with the node number N of the RPR rings. The high priority traffic has less packet delay than the low priority traffic at the same node number N. The increase of the low priority transfer delay is much larger than the high priority traffic with the increase of the node number.
© (2005) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Yi Yang, Mingcui Cao, Ping Huang, "Packet transfer delay analysis of the RPR rings in the store-and-forward architecture", Proc. SPIE 5626, Network Architectures, Management, and Applications II, (8 February 2005); doi: 10.1117/12.573515; https://doi.org/10.1117/12.573515
PROCEEDINGS
8 PAGES


SHARE
KEYWORDS
Data modeling

Switches

Manufacturing

Network architectures

Terbium

Computer simulations

Factor analysis

RELATED CONTENT


Back to Top