24 March 2006 Defining the role of SEM metrology for advanced process control
Author Affiliations +
Abstract
The problem of enacting an effective Advanced Process Control (APC) system is herein discussed [1]. The schematic structure of the system is represented below: (please see manuscript). The creation of such a system with a communication link between the mask designer and lithography and process engineering of consequent operations can be broken down into two problems: 1. Organization of the interaction of services performed by APC. 2. Reliability of the measurement information obtained in SEM CD metrology. We will focus on the second problem. The effectiveness of the operation of the APC system depends on the reliability (precision and accuracy) of the measurement outcomes.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
A. Nikitin, A. Nikitin, A. Sicignano, A. Sicignano, D. Yeremin, D. Yeremin, M. Sandy, M. Sandy, T. Goldburt, T. Goldburt, } "Defining the role of SEM metrology for advanced process control", Proc. SPIE 6152, Metrology, Inspection, and Process Control for Microlithography XX, 61523I (24 March 2006); doi: 10.1117/12.656701; https://doi.org/10.1117/12.656701
PROCEEDINGS
7 PAGES


SHARE
RELATED CONTENT

10nm three-dimensional CD-SEM metrology
Proceedings of SPIE (April 13 2014)
Charging control through extraction field
Proceedings of SPIE (June 01 2000)
Development Of Sem-Based Dedicated Ic Metrology System
Proceedings of SPIE (October 14 1984)

Back to Top