Paper
6 July 2006 Manufacture of a 1.7m prototype of the GMT primary mirror segments
H. M. Martin, J. H. Burge, S. M. Miller, B. K. Smith, R. Zehnder, C. Zhao
Author Affiliations +
Abstract
We have nearly completed the manufacture of a 1.7 m off-axis mirror as part of the technology development for the Giant Magellan Telescope. The mirror is an off-axis section of a 5.3 m f/0.73 parent paraboloid, making it roughly a 1:5 model of the outer 8.4 m GMT segment. The 1.7 m mirror will be the primary mirror of the New Solar Telescope at Big Bear Solar Observatory. It has a 2.7 mm peak-to-valley departure from the best-fit sphere, presenting a serious challenge in terms of both polishing and measurement. The mirror was polished with a stressed lap, which bends actively to match the local curvature at each point on the mirror surface, and works for asymmetric mirrors as well as symmetric aspheres. It was measured using a hybrid reflective-diffractive null corrector to compensate for the mirror's asphericity. Both techniques will be applied in scaled-up versions to the GMT segments.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
H. M. Martin, J. H. Burge, S. M. Miller, B. K. Smith, R. Zehnder, and C. Zhao "Manufacture of a 1.7m prototype of the GMT primary mirror segments", Proc. SPIE 6273, Optomechanical Technologies for Astronomy, 62730G (6 July 2006); https://doi.org/10.1117/12.672105
Lens.org Logo
CITATIONS
Cited by 23 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Polishing

Surface finishing

Off axis mirrors

Optical testing

Telescopes

Monochromatic aberrations

RELATED CONTENT

Primary mirror segment fabrication for CELT
Proceedings of SPIE (July 20 2000)
Fabrication and measured quality of the MMT primary mirror
Proceedings of SPIE (August 25 1998)
Optics for the 20/20 telescope
Proceedings of SPIE (January 30 2003)
Manufacture of 8.4 m off axis segments a 1...
Proceedings of SPIE (September 24 2004)

Back to Top