28 October 2006 Construction of the large-scale mining area decision-making support and the synthesis management platform
Author Affiliations +
Proceedings Volume 6421, Geoinformatics 2006: Geospatial Information Technology; 642118 (2006) https://doi.org/10.1117/12.713154
Event: Geoinformatics 2006: GNSS and Integrated Geospatial Applications, 2006, Wuhan, China
Abstract
Because of lacking modern information management and long-term planning, many serious problems, including environment, ecology, production and so forth, are found in Chinese large-scale, mid-scale and small-scale mining areas. GIS (Geographic Information System) can efficiently show its vital energies in problem solving, and which mainly depends on its powerful spatial analysis, decision-making and mass data storage and management ability. In this paper, we take large-scale mining area as an example to study GIS decision-making support, synthesis management platform applied mining area. According to characteristics of the large-scale mining area, we put forward a plan for GIS platform of information management and long-term planning of mining area: the platform is divided into decision support subsystem and the community synthesis management subsystem. The former includes following items: (1) Site selection, which is mainly for site selection of industrial production, commercial run and residential area; (2) Monitoring of reclaimed land and ecology, which is mainly for destructed field surface and subsurface of the mining area because of coal mining; (3) The synthesis management system of green mining, mainly for safety, efficiency and environment protection. The later, community synthesis management subsystem mainly includes: the community synthesis information subsystem and the public urgent predetermined planning subsystem. At last, some problems and shortages are analyzed in the system construction of the large-scale mining area.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Shudong Wang, Shudong Wang, Guli Japper, Guli Japper, Xiaohua Wang, Xiaohua Wang, } "Construction of the large-scale mining area decision-making support and the synthesis management platform", Proc. SPIE 6421, Geoinformatics 2006: Geospatial Information Technology, 642118 (28 October 2006); doi: 10.1117/12.713154; https://doi.org/10.1117/12.713154
PROCEEDINGS
7 PAGES


SHARE
Back to Top