PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
Based on the minimum field strength requirement within the whole GBAS service volume, this paper performs nominal
link power budget for GBAS VHF data broadcast (VDB) system, and the required power transmitted from VDB system
is derived. The paper elaborates the requirement of Desired-to-Undesired (D/U) signal ratio for a specific VHF airborne
receiver to ensure the normal operation by the test, and presents the experimental method and results for acquiring the
D/U signal ratios. The minimum geographical separations among GBAS, VOR and ILS stations are calculated according
to the specifications of these three kinds of navigation systems.
Yude Ni andRuihua Liu
"The setting for ground based augmentation system station", Proc. SPIE 6795, Second International Conference on Space Information Technology, 67956M (10 November 2007); https://doi.org/10.1117/12.775298
ACCESS THE FULL ARTICLE
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
The alert did not successfully save. Please try again later.
Yude Ni, Ruihua Liu, "The setting for ground based augmentation system station," Proc. SPIE 6795, Second International Conference on Space Information Technology, 67956M (10 November 2007); https://doi.org/10.1117/12.775298