12 July 2008 Applying HST lessons learned to JWST
Author Affiliations +
Abstract
The James Webb Space Telescope (JWST) is a 6.5 meter cryogenic observatory planned to launch in 2013. The observatory includes a three mirror anastigmat telescope with a deployed 18 segment primary mirror. Unlike the Hubble Space Telescope (HST), JWST will be difficult to service and therefore the development team needs to be highly confident the telescope will work after launch. Consequently, it is imperative that the team building JWST apply the lessons learned from the HST program so as to avoid repeating mistakes that led to a major optical error in HST. The purpose of this paper is to summarize what the JWST program is doing to apply the lessons learned from HST. It includes a summary of how the HST optical error was made, the lessons learned there from, and how the JWST program is applying these lessons to avoid the mistakes of the past and ensure correct JWST optical performance.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Lee D. Feinberg and Paul H. Geithner "Applying HST lessons learned to JWST", Proc. SPIE 7010, Space Telescopes and Instrumentation 2008: Optical, Infrared, and Millimeter, 70100N (12 July 2008); https://doi.org/10.1117/12.786490
PROCEEDINGS
9 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Hartmann test for the James Webb Space Telescope
Proceedings of SPIE (July 28 2016)
JWST telescope integration and test progress
Proceedings of SPIE (July 28 2016)
Optical testing activities for the SPICA telescope
Proceedings of SPIE (August 05 2010)
JWST primary mirror technology development lessons learned
Proceedings of SPIE (August 23 2010)
Optical verification of the James Webb Space Telescope
Proceedings of SPIE (June 21 2006)

Back to Top