12 July 2008 Running PILOT: operational challenges and plans for an Antarctic Observatory
Author Affiliations +
Abstract
We highlight the operational challenges and planned solutions faced by an optical observatory taking advantage of the superior astronomical observing potential of the Antarctic plateau. Unique operational aspects of an Antarctic optical observatory arise from its remoteness, the polar environment and the unusual observing cycle afforded by long continuous periods of darkness and daylight. PILOT is planned to be run with remote observing via satellite communications, and must overcome both limited physical access and data transfer. Commissioning and lifetime operations must deal with extended logistics chains, continual wintertime darkness, extremely low temperatures and frost accumulation amidst other challenging issues considered in the PILOT operational plan, and discussed in this presentation.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Andrew McGrath, Andrew McGrath, Will Saunders, Will Saunders, Peter Gillingham, Peter Gillingham, David Ward, David Ward, John Storey, John Storey, Jon Lawrence, Jon Lawrence, Roger Haynes, Roger Haynes, } "Running PILOT: operational challenges and plans for an Antarctic Observatory", Proc. SPIE 7016, Observatory Operations: Strategies, Processes, and Systems II, 70160G (12 July 2008); doi: 10.1117/12.788825; https://doi.org/10.1117/12.788825
PROCEEDINGS
12 PAGES


SHARE
RELATED CONTENT

ALMA Array Operations Group process overview
Proceedings of SPIE (July 15 2016)
SOFIA ground support facilities
Proceedings of SPIE (February 08 2002)
Design and performance of the ESA Optical Ground Station
Proceedings of SPIE (April 26 2002)
Goals and strategies in the global control design of the...
Proceedings of SPIE (September 13 2012)
OpenROCS: a software tool to control robotic observatories
Proceedings of SPIE (September 24 2012)

Back to Top