Paper
4 August 2010 Preliminary multivariable cost model for space telescopes
Author Affiliations +
Abstract
Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. This paper reviews the methodology used to develop space telescope cost models; summarizes recently published single variable models; and presents preliminary results for two and three variable cost models. Some of the findings are that increasing mass reduces cost; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and technology development as a function of time reduces cost at the rate of 50% per 17 years.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
H. Philip Stahl and Todd Henrichs "Preliminary multivariable cost model for space telescopes", Proc. SPIE 7731, Space Telescopes and Instrumentation 2010: Optical, Infrared, and Millimeter Wave, 773104 (4 August 2010); https://doi.org/10.1117/12.856214
Lens.org Logo
CITATIONS
Cited by 4 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Space telescopes

Data modeling

James Webb Space Telescope

Telescopes

Infrared telescopes

Mirrors

Statistical modeling

RELATED CONTENT

Parametric cost models for space telescopes
Proceedings of SPIE (November 20 2017)
Preliminary cost model for space telescopes
Proceedings of SPIE (August 26 2009)
Update on parametric cost models for space telescopes
Proceedings of SPIE (September 14 2011)
Cost modeling for space optical telescope assemblies
Proceedings of SPIE (October 25 2011)

Back to Top