28 July 2010 GREGOR telescope: start of commissioning
Author Affiliations +
Abstract
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
R. Volkmer, O. von der Lühe, C. Denker, S. Solanki, H. Balthasar, T. Berkefeld, P. Caligari, M. Collados, C. Halbgewachs, F. Heidecke, A. Hofmann, M. Klvana, F. Kneer, A. Lagg, E. Popow, D. Schmidt, W. Schmidt, M. Sobotka, D. Soltau, and K. Strassmeier "GREGOR telescope: start of commissioning", Proc. SPIE 7733, Ground-based and Airborne Telescopes III, 77330K (28 July 2010); https://doi.org/10.1117/12.857079
PROCEEDINGS
9 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Lunar-based solar telescope of multi-wavelength
Proceedings of SPIE (November 09 2010)
GREGOR: the new 1.5-m solar telescope on Tenerife
Proceedings of SPIE (February 11 2003)
Thermal characteristics of the solar telescope GREGOR
Proceedings of SPIE (July 22 2008)

Back to Top