4 August 2010 Management evolution in the LSST project
Author Affiliations +
Abstract
The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Donald Sweeney, Donald Sweeney, Charles Claver, Charles Claver, Suzanne Jacoby, Suzanne Jacoby, Jeffrey Kantor, Jeffrey Kantor, Victor Krabbendam, Victor Krabbendam, Nadine Kurita, Nadine Kurita, } "Management evolution in the LSST project", Proc. SPIE 7738, Modeling, Systems Engineering, and Project Management for Astronomy IV, 77380P (4 August 2010); doi: 10.1117/12.857301; https://doi.org/10.1117/12.857301
PROCEEDINGS
9 PAGES


SHARE
RELATED CONTENT

LSST OCS status and plans
Proceedings of SPIE (August 07 2016)
LSST telescope and site status
Proceedings of SPIE (July 26 2016)
LSST control system
Proceedings of SPIE (June 26 2006)
LSST Telescope mount and pier design overview
Proceedings of SPIE (July 28 2010)
Magellan project
Proceedings of SPIE (August 01 2000)

Back to Top