1 October 2011 Study on project schedule management based on comprehensive comparison methods
Jun-ying Ge
Author Affiliations +
Proceedings Volume 8285, International Conference on Graphic and Image Processing (ICGIP 2011); 82852P (2011) https://doi.org/10.1117/12.913585
Event: 2011 International Conference on Graphic and Image Processing, 2011, Cairo, Egypt
Abstract
Project schedule management is the central content in project organization plan, which affects the project time and investment. The traditional representation methods of schedule are gant chart, network chart, S curve, etc. With the engineering scale increasing constantly, techniques and management level are improving, single method can not meet the requirements of project schedule management. Comprehensive comparison method gets more and more attention, and has become one symbol of project management modernization with its vivacity and brevity form. The paper analyzes the factors that affect the project, and then compare the progress of the different control methods, finally it made some management measures of project schedule.
© (2011) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Jun-ying Ge "Study on project schedule management based on comprehensive comparison methods", Proc. SPIE 8285, International Conference on Graphic and Image Processing (ICGIP 2011), 82852P (1 October 2011); https://doi.org/10.1117/12.913585
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Analytical research

Factor analysis

Inspection

Civil engineering

Current controlled current source

Germanium

Image processing

Back to Top