17 September 2012 Manufacturing optics of a 2.5m telescope
Author Affiliations +
Abstract
Over the past few years, Sagem REOSC has designed, manufactured and tested a 2.5m ALT/AZ telescope and its complete observatory. The next stage - integration - should occur in 2012. The aim of this paper is to develop the different stages of the project from technical and management's point of view. The telescope is a 2.5m-class telescope with an aperture of F/8. It is composed of a 2.5m primary mirror made of Zerodur©, a silica secondary mirror and a rotating tertiary mirror that allows pointing at Nasmyth foci. In addition, a wide field corrector can be adapted either at Cassegrain focus or at Nasmyth focus. Results achieved on the realization of such optics will be presented. An emphasis on the concurrent engineering and the problem solving approach will also be presented.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
F. Poutriquet, F. Poutriquet, P. Plainchamp, P. Plainchamp, J. Billet, J. Billet, B. Pernet, B. Pernet, T. Lagrange, T. Lagrange, C. Cavadore, C. Cavadore, JL Carel, JL Carel, H. Leplan, H. Leplan, E. Ruch, E. Ruch, R. Geyl, R. Geyl, JC Jouve, JC Jouve, } "Manufacturing optics of a 2.5m telescope", Proc. SPIE 8444, Ground-based and Airborne Telescopes IV, 84441W (17 September 2012); doi: 10.1117/12.926106; https://doi.org/10.1117/12.926106
PROCEEDINGS
7 PAGES


SHARE
RELATED CONTENT

A new paradigm for space astrophysics mission design
Proceedings of SPIE (August 01 2014)
Lessons not to make light of (when designing optical systems...
Proceedings of SPIE (September 08 2015)
SOFIA lightweight primary mirror
Proceedings of SPIE (August 24 1998)
The Cesic ceramic optics of the GREGOR telescope
Proceedings of SPIE (July 05 2006)
Status of the Giant Magellan Telescope (GMT) project
Proceedings of SPIE (September 27 2004)

Back to Top