Translator Disclaimer
17 September 2012 Folded Cassegrain sets of the Gran Telescopio Canarias (GTC)
Author Affiliations +
Abstract
The Gran Telescopio Canarias (GTC) has been recently received two Folded Cassegrain Sets (FC-Sets) composed of an instrument rotator and the corresponding Acquisition and Guiding (AG) optomechanics. IDOM has been the responsible for the design, manufacturing, assembly and commissioning of the two units of FC-Sets. The design combines a compact layout of the mechanical system, enhanced by an innovative cable wrap design, resulting in a smooth and precise movement, whilst guaranteeing good access to important components and maximizing the maintainability. The custom design of the cable wrap as an evolution of the rolling loop type eliminates the need for a cable chain static housing, minimizing weight and impact on the telescope tube. The AG Mechanics provides the required pointing and focusing capabilities in a compact configuration. In January 2010, IDOM is awarded the design and procurement of the two FC-Sets. The final design is approved by GRANTECAN and the fabrication process starts in Nov 2011. The assembly and commissioning of both units are completed in April 2011. Once the Factory Acceptance Tests finishes in Dec 2011, all the elements are delivered to the Observatorio del Roque de los Muchachos (ORM). The Site Acceptance Tests are completed in Feb 2012.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Alberto Gomez, Rubén Sanquirce, Gaizka Murga, Borja Etxeita, Alberto Vizcargüenaga, Ander San Vicente, Esther Fernandez, Oscar Vega, and Benjamín Siegel "Folded Cassegrain sets of the Gran Telescopio Canarias (GTC)", Proc. SPIE 8444, Ground-based and Airborne Telescopes IV, 84444N (17 September 2012); https://doi.org/10.1117/12.926388
PROCEEDINGS
13 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Large Synoptic Survey Telescope mount final design
Proceedings of SPIE (August 18 2016)
Assembly and integration to first light of the four VLT...
Proceedings of SPIE (August 02 2000)
GTC dome: entering into manufacturing
Proceedings of SPIE (August 02 2000)
The VLTI Auxiliary Telescope System a big challenge for...
Proceedings of SPIE (September 16 2004)
QUIJOTE telescope design and fabrication
Proceedings of SPIE (July 28 2010)

Back to Top