25 September 2012 VST system engineering and management of commissioning
Author Affiliations +
Abstract
This paper describes the system engineering work at the VLT Survey Telescope on the ESO’s Paranal observatory. The error budget, as well as many subsystems and their integration in the overall telescope system, have been deeply reviewed in the last years of construction and commissioning. The lessons learned in the management of the commissioning of a complex system in a remote site are also analyzed.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Pietro Schipani, Pietro Schipani, } "VST system engineering and management of commissioning", Proc. SPIE 8449, Modeling, Systems Engineering, and Project Management for Astronomy V, 84491H (25 September 2012); doi: 10.1117/12.926362; https://doi.org/10.1117/12.926362
PROCEEDINGS
7 PAGES


SHARE
RELATED CONTENT

E-ELT vibration modeling, simulation, and budgeting
Proceedings of SPIE (July 05 2016)
Telescope performance at the Large Binocular Telescope
Proceedings of SPIE (July 27 2016)
WIYN active optics: a platform for AO
Proceedings of SPIE (September 11 1998)
The ESO NTT (New Technology Telescope) The First Active...
Proceedings of SPIE (September 20 1989)
E ELT phase A instrument studies a system engineering...
Proceedings of SPIE (August 04 2010)

Back to Top