Abstract
Many large-scale plants are currently being planned or constructed worldwide. Clients require contractors to minimize construction costs and work periods. We are striving to streamline construction work and thus reduce construction costs by focusing on simplifying installation work, shortening installation periods, standardizing all on-site work, and improving quality and safety. When pipes are installed at large-scale plant construction sites, pipes for adjustment called final spools are sometimes inserted between facilities that have been installed and piping that has been fastened. They are delivered to sites in a state that allows for on-site processing. After delivery, on-site matching and adjustment of the amount of processing based on the result of the on-site matching are repeated, and then the final spools are fitted into the spaces between facilities and piping. We have researched and developed a virtual fitting system to streamline fitting work. This paper describes the details of this system and the results of its application.
© (2013) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Hiroshi Yokoyama and Kazuyuki Takeuchi "Development of virtual pipe fitting system", Proc. SPIE 8791, Videometrics, Range Imaging, and Applications XII; and Automated Visual Inspection, 879110 (23 May 2013); https://doi.org/10.1117/12.2020321
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
CAD systems

3D metrology

Computer aided design

3D modeling

Data modeling

Safety

3D displays

Back to Top