22 July 2014 Stress polishing demonstrator for ELT M1 segments and industrialization
Author Affiliations +
Abstract
After two years of research and development under ESO support, LAM and Thales SESO present the results of their experiment for the fast and accurate polishing under stress of ELT 1.5 meter segments as well as the industrialization approach for mass production. Based on stress polishing, this manufacturing method requires the conception of a warping harness able to generate extremely accurate bending of the optical surface of the segments during the polishing. The conception of the warping harness is based on finite element analysis and allowed a fine tuning of each geometrical parameter of the system in order to fit an error budget of 25nm RMS over 300μm of bending peak to valley. The optimisation approach uses the simulated influence functions to extract the system eigenmodes and characterise the performance. The same approach is used for the full characterisation of the system itself. The warping harness has been manufactured, integrated and assembled with the Zerodur 1.5 meter segment on the LAM 2.5meter POLARIS polishing facility. The experiment consists in a cross check of optical and mechanical measurements of the mirrors bending in order to develop a blind process, ie to bypass the optical measurement during the final industrial process. This article describes the optical and mechanical measurements, the influence functions and eigenmodes of the system and the full performance characterisation of the warping harness.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Emmanuel Hugot, Emmanuel Hugot, Anaïs Bernard, Anaïs Bernard, Marie Laslandes, Marie Laslandes, Johan Floriot, Johan Floriot, Thibaut Dufour, Thibaut Dufour, Denis Fappani, Denis Fappani, Jean Marc Combes, Jean Marc Combes, Marc Ferrari, Marc Ferrari, "Stress polishing demonstrator for ELT M1 segments and industrialization", Proc. SPIE 9145, Ground-based and Airborne Telescopes V, 914539 (22 July 2014); doi: 10.1117/12.2055867; https://doi.org/10.1117/12.2055867
PROCEEDINGS
11 PAGES


SHARE
RELATED CONTENT

Fabrication and metrology study for M3M of TMT
Proceedings of SPIE (September 01 2014)
Polishing of a 6.5 m f 1.25 mirror for the...
Proceedings of SPIE (September 05 1999)
Optical figuring and testing of the VLT 8.2 m primary...
Proceedings of SPIE (September 07 1995)
Progress in the stressed lap polishing of a 1.8 m...
Proceedings of SPIE (June 30 1990)

Back to Top