6 August 2014 Implementing extended observing at the JCMT
Author Affiliations +
Abstract
The James Clerk Maxwell Telescope (JCMT) is the largest single dish submillimetre telescope in the world. Recently the Joint Astronomy Centre (JAC) has learned that the JCMT will no longer receive financial support from its original supporting agencies after September 2014. There is significant pressure to complete some surveys that have been in progress at the JCMT for many years now. With the goal of completing a higher percentage of these surveys it was decided to take advantage of the hours between when the telescope operator leaves the telescope and when the day crew arrives. These hours generally have reasonable seeing and low column integrated water vapor, so they are good for observing. This observing is being performed remotely, in Hilo, without staff at the telescope, by staff members who do not have telescope operation as part of their job descriptions. This paper describes the hardware changes necessary to implement remote observing at JCMT. It also describes the software needed for remote, fail safe, operation of the telescope. The protocols and rules for passing the control of the telescope between the various groups are discussed. Since these Extended Operators are not expert telescope operators, the system was simplified as much as possible, but some training was necessary and proper checklists are essential. Due to the success of the first phase of Extending Observing at the JCMT, the hours when the weather is good and no one is at the telescope, but no day crew is on the way, are also now being utilized. Extended Observing has already yielded a considerable amount of science observing time.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Craig Walther, Jessica Dempsey, Ian Campbell, "Implementing extended observing at the JCMT", Proc. SPIE 9149, Observatory Operations: Strategies, Processes, and Systems V, 91492G (6 August 2014); doi: 10.1117/12.2056953; https://doi.org/10.1117/12.2056953
PROCEEDINGS
9 PAGES


SHARE
RELATED CONTENT

Two years of ALMA bibliography: lessons learned
Proceedings of SPIE (August 06 2014)
More effective fault management at SALT
Proceedings of SPIE (July 10 2018)
The Subaru top unit exchanger
Proceedings of SPIE (February 04 2003)
Goals and strategies in the global control design of the...
Proceedings of SPIE (September 13 2012)
A global network of robotic telescopes
Proceedings of SPIE (June 23 2006)

Back to Top