4 August 2014 Systems engineering of the Thirty Meter Telescope for the construction phase
Author Affiliations +
Abstract
This paper provides an overview of the system design, architecture, and construction phase system engineering processes of the Thirty Meter Telescope project. We summarize the key challenges and our solutions for managing TMT systems engineering during the construction phase. We provide an overview of system budgets, requirements and interfaces, and the management thereof. The requirements engineering processes, including verification and plans for collection of technical data and testing during the assembly and integration phases, are described. We present configuration, change control and technical review processes, covering all aspects of the system design including performance models, requirements, and CAD databases.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Scott Roberts, Scott Roberts, John Rogers, John Rogers, Hugh Thompson, Hugh Thompson, Konstantinos Vogiatzis, Konstantinos Vogiatzis, Douglas MacMartin, Douglas MacMartin, Eric Wilde, Eric Wilde, Mitchell Troy, Mitchell Troy, Byoung-Joon Seo, Byoung-Joon Seo, Carl Nissly, Carl Nissly, } "Systems engineering of the Thirty Meter Telescope for the construction phase", Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91500V (4 August 2014); doi: 10.1117/12.2056870; https://doi.org/10.1117/12.2056870
PROCEEDINGS
15 PAGES


SHARE
Back to Top