5 August 2014 Systems engineering implementation in the conceptual design phase of 4MOST
Author Affiliations +
Abstract
The 4MOST Facility is a very high-multiplex, wide-field, fibre-fed spectrograph system for the VISTA telescope. Its aim is to create a world-class spectroscopic survey facility that is unique in its combination of wide-field multiplex, spectral resolution and coverage, and sensitivity. In such a complex instrumentation project, in which design and development activities are geographically distributed, a formal system engineering approach is essential for the success of the project. We present an overview of the systems engineering principles, and associated tools, implemented during the conceptual design phase, as well as the systems engineering activities planned for the preliminary design phase.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Olga Bellido-Tirado, Olga Bellido-Tirado, Roger Haynes, Roger Haynes, Roelof S. de Jong, Roelof S. de Jong, Olivier Schnurr, Olivier Schnurr, Jakob Walcher, Jakob Walcher, Roland Winkler, Roland Winkler, } "Systems engineering implementation in the conceptual design phase of 4MOST", Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91501B (5 August 2014); doi: 10.1117/12.2056301; https://doi.org/10.1117/12.2056301
PROCEEDINGS
10 PAGES


SHARE
Back to Top