12 May 2015 Status of PAL-XFEL
Author Affiliations +
Abstract
The PAL-XFEL, a 0.1-nm hard X-ray FEL facility consisting of a 10-GeV S-band linac, is being constructed in Pohang, South Korea. Its building construction was completed at the end of 2014. The major procurement contracts were complete for the critical components of S-band linac modules and undulators. The installation of linac, undulator, and beam line will be completed by 2015. The commissioning will get started in January 2016 aiming for the first lasing in 2016. We will report the current status, construction progress, and commissioning plans for the PAL XFEL project, including major subsystem preparations.
© (2015) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
H.-S. Kang, K.-W. Kim, and I. S. Ko "Status of PAL-XFEL", Proc. SPIE 9512, Advances in X-ray Free-Electron Lasers Instrumentation III, 95120P (12 May 2015); https://doi.org/10.1117/12.2183141
PROCEEDINGS
8 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Status of the PAL-XFEL undulator program
Proceedings of SPIE (May 12 2015)
Terahertz generation and acceleration
Proceedings of SPIE (March 01 2019)
The BESSY soft x-ray FEL
Proceedings of SPIE (May 18 2007)
Toward attosecond x-ray pulses from the FEL
Proceedings of SPIE (November 10 2004)
Status of the BESSY-FEL project
Proceedings of SPIE (August 30 2005)
Short-wavelength light sources at Duke storage ring
Proceedings of SPIE (September 25 1995)

Back to Top