The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United States National Oceanic and Atmospheric Administration (NOAA). The National Aeronautics and Space Administration (NASA) is procuring the GOES-R spacecraft and instruments with the first launch of the GOES-R series planned for October 2016. Included in the GOES-R Instrument suite is the Geostationary Lightning Mapper (GLM). GLM is a single-channel, near-infrared optical detector that can sense extremely brief (800 μs) transient changes in the atmosphere, indicating the presence of lightning. GLM will measure total lightning activity continuously over the Americas and adjacent ocean regions with near-uniform spatial resolution of approximately 10 km.

Due to its large CCD (1372x1300 pixels), high frame rate, sensitivity and onboard event filtering, GLM will require extensive post launch characterization and calibration. Daytime and nighttime images will be used to characterize both image quality criteria inherent to GLM as a space-based optic system (focus, stray light, crosstalk, solar glint) and programmable image processing criteria (dark offsets, gain, noise, linearity, dynamic range). In addition ground data filtering will be adjusted based on lightning-specific phenomenology (coherence) to isolate real from false transients with their own characteristics. These parameters will be updated, as needed, on orbit in an iterative process guided by pre-launch testing. This paper discusses the planned tests to be performed on GLM over the six-month Post Launch Test period to optimize and demonstrate GLM performance.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Marc Rafal, Marc Rafal, Jared T. Clarke, Jared T. Clarke, Ruth W. Cholvibul, Ruth W. Cholvibul, "Post launch calibration and testing of the Geostationary Lightning Mapper on GOES-R satellite", Proc. SPIE 9881, Earth Observing Missions and Sensors: Development, Implementation, and Characterization IV, 98812E (12 May 2016); doi: 10.1117/12.2228540; https://doi.org/10.1117/12.2228540
PROCEEDINGS
8 PAGES


SHARE
RELATED CONTENT

Technology needs for geostationary remote sensors
Proceedings of SPIE (November 14 1993)
Ultraviolet imager for ISTP
Proceedings of SPIE (June 28 1992)
Gaia's FPA: sampling the sky in silicon
Proceedings of SPIE (September 20 2012)
UV/visible camera for the Clementine mission
Proceedings of SPIE (June 01 1995)
POLDER level-1 processing algorithms
Proceedings of SPIE (June 16 1996)

Back to Top