27 July 2016 LSST mirror system status: from design to fabrication and integration
Author Affiliations +
Abstract
In the construction phase since 2014, the Large Synoptic Survey Telescope (LSST) is an 8.4 meter diameter wide-field (3.5 degrees) survey telescope located on the summit of Cerro Pachón in Chile. The reflective telescope uses an 8.4 m f/1.06 concave primary, an annular 3.4 m meniscus convex aspheric secondary and a 5.2 m concave tertiary. The primary and tertiary mirrors are aspheric surfaces figured from a monolithic substrate and referred to as the M1M3 mirror. This unique design offers significant advantages in the reduction of degrees of freedom, improved structural stiffness for the otherwise annular surfaces, and enables a very compact design. The three-mirror system feeds a threeelement refractive corrector to produce a 3.5 degree diameter field of view on a 64 cm diameter flat focal surface. This paper describes the current status of the mirror system components and provides an overview of the upcoming milestones including the mirror coating and the mirror system integrated tests prior to summit integration.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Constanza Araujo-Hauck, Constanza Araujo-Hauck, Jacques Sebag, Jacques Sebag, Ming Liang, Ming Liang, Douglas Neill, Douglas Neill, Gary Muller, Gary Muller, Sandrine J. Thomas, Sandrine J. Thomas, Tomislav Vucina, Tomislav Vucina, William J. Gressler, William J. Gressler, } "LSST mirror system status: from design to fabrication and integration", Proc. SPIE 9906, Ground-based and Airborne Telescopes VI, 99060L (27 July 2016); doi: 10.1117/12.2232923; https://doi.org/10.1117/12.2232923
PROCEEDINGS
10 PAGES


SHARE
RELATED CONTENT

LSST Telescope and site status
Proceedings of SPIE (July 21 2014)
LSST secondary mirror assembly
Proceedings of SPIE (July 05 2018)
LSST primary/tertiary mirror cell assembly integration
Proceedings of SPIE (July 05 2018)
LSST coating plant status and progress
Proceedings of SPIE (July 05 2018)
LSST secondary mirror assembly baseline design
Proceedings of SPIE (September 16 2012)
SOAR 4.1-m Telescope: from commissioning to early science
Proceedings of SPIE (September 27 2004)

Back to Top